Thursday, February 25, 2010

Tower Crane (Potain/MC 310 K16) - SWL16 T x 70m Radius

Getting ready to rig up the tower crane.  Although she can go up to 70 over metres high, we will stop at 30m.  She will come in handy when operation starts.  Crane spec can be found here http://www.manta.com.sg/pdf/topkit/MC310K16.pdf.

Wednesday, February 24, 2010

250-Ton Shipyard Transporter

The transporter arrived in Singapore on 17 Feb 2010. It is seen below sitting pretty on a Cometto and waiting for final delivery to our Bintan yard.  If the plan goes well, she will be in Bintan on 4th Mar.




A little technical information on the transporter:-

Max Payload - 250 Tons
Unladen Weight - 55 Tons
Platform Size - 6m W x 16m L
Velocity - 0~5km/hr (flat road; full load)
Max Slope Climbing (full load) - 6 deg (vertical climb); 2 deg (cross climb)
Platform Height (w/o load) - 1600mm
Platform Lifting Height - +700mm
Steering Control - built-in cabins on fwd & aft
Remote Control - external radio-frequency control joystick
Note - Ready for coupling to another transporter for additional payload.

Tuesday, February 2, 2010

Arrival of Liebherr 85-Ton Crawler Crane

After much deliberation on option 1, 2, 3, 4.............., we finally got the crane into the estate on 20 Jan 2010. Time to get it to work! Our GM, CP Tai was personally on site to make sure everything went well (and also to get some photos).

The crane seen being driven out of the LCT "Kimtrans Emperor" at the roro jetty.