LOT 2, BINTAN INDUSTRIAL ESTATE
LOBAM, BINTAN, KEPULAUAN,
RIAU 29154, INDONESIA

Saturday, March 6, 2010

Construction-in-Progress

Construction-in-Progress as seen on 5 March 2010.

 
Chandra updating everyone on the progress.  
Main access road under construction on the right.

Production floor for Workshops A & B being laid with
reinforced concrete.  All RC footings have been completed
and the workshops are ready for erection.
Yellow building on the top left is the
completed production toilets.

 
Sections of tower crane's mast prepared for erection.

 
The 6000kg topmost section of the tower crane sitting lonesome and
unmajestically on the ground.  
For reasons unknown, it is called the Cat Head.  
It wouldn't be long before it will be one of the
the highest points in the estate once it is elevated to the 
height of 45m.

The "Inspectors" going to check out the apartments.  
At 50m2 each, it is a decent size for 1 or 2 persons.

Final design after strict specification and 
approval by Melvyn!

Yard Canteen

 
The Main Office is 90% ready.  Brand new meeting room.


 
One of the managers' offices

General office

 
Pantry

No comments:

Post a Comment