Over the next few days, we shall see almost 1,270 Tons of material and equipment being transferred from our Singapore yard to the Centre. We have the 200' barge "E.T. Offshore 27"& 894 HP Tug "E.T. Ocean 9" on charter for this shipment.
Loaded onboard shall be our brand new 250-Ton shipyard transporter, 10-Ton Verlinde gantry crane, 108 Tons of steel material, 490 units of concrete blocks (weighing almost 1,029 Tons in total), gritblasting equipment and miscellaneous items.
Loading Operation
Transporter being driven onto the barge.
The ramps are not so good!
Some of the concrete blocks waiting to be lifted onboard.
Will be quite a sight when the barge arrives at the SOC on 5th March.
No comments: